This line is now ready and I can produce:
I have:
Finished Product (per day)
120 "Hemp Rope"
Varied number of Masts, Sails, and Spars
Surplus items (per day)
6x "Wood Tar"
Breakdown of how the production line works
Total “Hemp” = 180/day
Total “Logs, Fir” = 240/day
Total “Wood Tar” = 30/day
Total “Hemp Canvas” = 30/day
“Sail, Large”
“Sail, Medium”
2 “Sail, Small”
Total “Hemp Rope” = 120/day
1 “Mast Section, Large”
1 “Mast Section, Medium”
1 “Mast Section, Small”
5 “Spar, Large”
5 “Spar, Medium”
5 “Spar, Small”
3x Plantation (General)
1x Logging Camp (Fir)
1x Tar Distillery
3x Textile Mill ( 2 atm)
1x Lumber Mill
Master Draughtsan